Volkmann Railroad Builders is changing out 4000 feet of rail (2000
track feet) on the mainline this week. The location is between Signal 202 and
Signal 252. Rail released from the project will be used to
complete yard 15 and supply material for construction of other storage tracks
on the property.
I wonder what was wrong with the older rail?
ReplyDeleteWhat weight of rail was replaced? What weight of rail was installed? Why the change?
ReplyDelete