Friday, April 9, 2021

Doodlebug Progress

 Another report from a very busy Gregg Wolfersheim:



Up near the roofline of M35 we have the vent collar for the men's room in place.  Doodlebug  Dan was out on Saturday and helped me confirm the location for the conduit you see in this photo. A hole was bored through the carline and the end was shoved into it. The wires on the other side will be shoved through another hole (not shown) and will feed the light fixture for the toilet compartment.

The conductor's desk light was reinstalled on the wall.


On the other side of the wall, the junction box and BX cable were attached inside of the men's room. The worn painted surface is where the water cooler will be. Note the paper towel dispenser, also recently mounted.