Thursday, August 31, 2023

Wednesday Brief

 The first task on Wednesday was to put the original bearing back together on the 309 so it can be moved over the pit at some point.  On Sunday the heavy motor cap was lifted onto the platform, and after some effort I was able to get the two halves in place on the axle, as seen here:


And from there, it's relatively simple to bolt the assembly together, although it's rather cramped.


So I removed the red tags, and the car can be run under its own power whenever necessary.  And I worked on getting everything ready for operation with the 36 and 319 on Saturday.

Pete and Fritz are working on window and door frames for the latest Freight Dept. project (now that the bobber is finished), a Pennsylvania RR tool car.  One of these days we'll have to get some pictures of it.






And here Victor is running lumber through the jointer for the tool car siding:


And here are the folding doors for the 306:  





No comments:

Post a Comment

Please identify yourself with a name of some sort in your comment. Completely anonymous comments will be deleted. Thanks!