Thursday, March 2, 2023

Doodlebug Update

Better late than never, here's another update on the M-35 from Gregg Wolfersheim:


The upper walls in the smoker compartment of the doodlebug are nearing completion. 


The long strips on the left were the wall to ceiling trim seen earlier. The white board in primer is from under the steel window sill next to the toilet. The piece with the hole in it is the spacer the toilet sits on over the floor. The big block fits into the lower wall area and exists only to hold the dump valve for the toilet. These last two parts needed some work as they both fell apart while removing them. Some long screws and epoxy have saved them for reuse.

The top trim piece was made new and installed between the wall and ceiling panel.

Work has turned towards the women's toilet area. The toilet was removed, and repairs are being made to the sash openings.

No comments: