Gregg Wolfersheim has sent us a quick update of work that has taken place over the past week or so on Green Bay & Western 109...
The 109 has been brought into Barn 4 and work has resumed with the framing of the south side. The horizontal sill piece was added. The actual window sill will sit on top of this part.
Almost all of the vertical posts are in. Only the one where the bay window was is left to do. Then the rest of the sill can be filled in.