Gregg Wolfersheim has sent along another update of progress on Green Bay & Western 109, the wood car currently in the Barn 4 Electric Car Shop.
Slowly the bad stuff goes away on the wood coach.
New siding is getting spliced in.
About 40 pieces are beveled at a time and then primed on the back side.
About 60% of the lower siding is on. The areas between windows are mostly done on this side. Where the bay window was, we are framing it in and making it a solid wall for now.
On the east end of the car there were severely deteriorated pieces of siding. Underneath, it is in pretty good shape. New siding is in the works!
1 comment:
For some reason I am fond of that passenger car. Perhaps it is the green glass above the windows which are seeing the light of day for the first time in a long time. TM IRM Member who likes wood cars