If you are interested, the station is for sale. It comes with a 1.1 acre lot, with parking space for 220 cars. I can put you in touch with the owner.
News and views of progress at the Illinois Railway Museum
Thursday, June 24, 2010
Dave's Depots -Illinois Central Depot - Belleville, Illinois
If you are interested, the station is for sale. It comes with a 1.1 acre lot, with parking space for 220 cars. I can put you in touch with the owner.
Posted by
David Wilkins
at
7:00 AM
0
comments
Labels: Dave's Depots, Illinois - Mile After Magnificent Mile
Wednesday, June 23, 2010
A Tale of Two Trucks
For those interested in "the rest of the story" on the truck swap, below is something of a photo essay. I managed to take quite a few pictures during the process (at the expense of the work I was supposed to be doing!) and these are just some highlights.
At right, some of the crew goes over the game plan in the CTM parking lot. L-R: Jeff Brady (IRM), Norm Krentel (IRM), and Chris Chestnut (CTM), who was the de facto project manager for the entire operation.
At left, the beginning of the truck unloading project. The nose of the trailer has been detached and a front-end loader is being used to lift one end of the Pullman truck off of the flatbed.
At right, Jeff Hakner (Branford Electric Railway Association/IRM) on the left guides a CTM volunteer running a gigantic backhoe in picking up the other end of the Pullman truck to lift it off of the flatbed.
The next morning, Randy Hicks (IRM) stands in front of the 303 before the commencement of activities. This photo was taken at 8am; little did we know we'd still be here 14 hours later!
At right, the car starts to go up. Chris Chestnut (back to camera) watches the plumb bob with a CTM volunteer inside the 303 while two more CTM volunteers (left) and Randy Hicks (right) work the jacks.
At left, Chris Chestnut (L) and Norm Krentel keep a close eye on the 303 as it is jacked clear of the Baldwin truck. In the left foreground is the car's center bearing, which had been unbolted from the car's body bolster before jacking commenced.
Following a lunch at the CTM food stand, the crew got back to work. With the car jacked up clear of the Baldwin truck, the truck was rolled partway out from under the car and the new center bearing (the one brought from IRM in the crate) was installed. At right, L-R, Norm Krentel, Randy Hicks and Chris Chestnut, with Jeff Hakner behind Chris, use a jack to hold the center bearing tentatively in place while it is bolted to the 303's bolster.

CTM had a variety of heavy equipment on hand to do a variety of tasks. A combination front-end loader/backhoe was used for switching the trucks through the shop yard. At right, the Baldwin MCB truck destined for IRM and the 36 (left) is pulled away from the 303 while the Pullman MCB truck brought from Illinois (right) stands ready to be rolled underneath the 303.
But finally, at about 5:30pm, the 303 was set down on the Pullman MCB truck and the jacks were pulled away. Seeing a car body weighing perhaps 50,000 lbs up on jacks is always a slightly unnerving site and it's always nice to see it back on trucks where it belongs!
Below, part of the group takes a breather and enjoys some of the cupcakes brought by Ray Bellock's daughter in honor of the 749 dedication being held back in Illinois that day. L-R in foreground: Jeff Brady, Norm Krentel, Randy Hicks and Chris Chestnut.


Shortly after this work was done, the 303 was ready to test. The brake rods were reattached by Jeff Brady and Norm Krentel and Jeff Hakner reattached the motor leads. However after moving a few feet, the 303 wouldn't move any more. The motors worked but the car wouldn't budge. It took quite a bit of time but the problem was diagnosed to be one of the axle cap bearings, which had not seated properly and had become jammed in between the motor case and the axle.

After a lot of hard work on the part of Norm, Jeff and Chris, the axle cap bearing was correctly seated, the axle cap replaced and power put to the car once again. This time it rolled! After a couple of brief test trips, Chris ran it back into the CTM shop building under power at about 10:45pm as seen below.

Posted by
Frank Hicks
at
11:48 AM
7
comments
Labels: 36 Progress, Trip Reports
Tuesday, June 22, 2010
More New Paint
The most pressing concern today was to check on the 321's tarp. I was very afraid that with the recent storms it would have blown off altogether. I was very relieved to find that it had been secured by Joel Ahrendt and was still doing its job. He has some ideas for attaching it more reliably. We can't thank you enough, Joel!Frank Sirinek helped me move the spare windows out to the 321 on the golf cart; I put them in the car and removed some parts I needed for the 319: a coupler pin and a dummy coupling for the brake pipe hose.


Meanwhile, the 409 has been painted, as seen here in Barn 2. It looks great! And we spent some time discussing paint colors again.

It was too hot and humid to do a lot of heavy lifting, but I put all of the seat cushions into the main compartment of the 319, so it's ready for service. There are still a few I'm unable to restore, so I hope to find four good ones from the 318 in storage and install them.The 36's motor truck arrived just as I was about to leave; Nick said he would be able to unload it.
Posted by
Randall Hicks
at
7:23 PM
1 comments
Labels: 319 Progress
Sunday, June 20, 2010
Truck Swaps and Other Pieces of Cake
Phew! After a long 14-hour day in what was admittedly beautiful weather, the truck swap is complete! The Pullman MCB truck that was brought from Illinois is now under the 303 and the motors have been successfully tested (following a bit of unanticipated bearing work), and the Baldwin MCB truck that has been in Connecticut the past few months is on the truck headed for IRM. Both 36 and 303 will now have their correct trucks.
A huge *thank you* to everyone from Connecticut Trolley Museum who helped out; Chris and a large crew of helpers from CTM literally did the heavy lifting on this project, while Jeff Hakner, Jim Lillie and IRM travelers Randy Hicks, Jeff Brady and Norm Krentel were indispensable to the success of the project. More photos and a full account will follow soon, so stay tuned!Oh, and those "other" pieces of cake? Ray Bellock's daughter and her family stopped by with green and yellow cupcakes labeled "749" for 749 Dedication Day! It was a great taste of home on the distant shores of Connecticut; we all wished we could have been in Union for the festivities and are grateful to everyone who set up this special delivery!
Posted by
Frank Hicks
at
12:50 AM
2
comments
Labels: 36 Progress, Trip Reports
Friday, June 18, 2010
Postcard from Connecticut
All four of us (Frank and Randy Hicks, Norm Krentel and Jeff Brady) arrived in Hartford at lunchtime and headed over to Warehouse Point (Connecticut Trolley Museum), where we met up with Chris Chestnut and his gang and got to work on the 303. We unloaded the Pullman truck formerly under the 36 with the help of driver Jim Lillie and his assistant and packed the motor armature bearings in the truck as well. A big "thank you" to Jim, Chris and the gang from CTM, and Jeff Hakner, an IRM volunteer from Branford who drove up to help out. More to come later!
Posted by
Frank Hicks
at
10:05 PM
2
comments
Labels: 36 Progress, Trip Reports
Thursday, June 17, 2010
Cruisin' Illinois Visits IRM
Posted by
Randall Hicks
at
9:54 PM
1 comments
Labels: Publicity
Our Trip To Connecticut
Everything seems to be set for our trip to the Connecticut Trolley Museum at Warehouse Point to swap motor trucks for our CA&E car 36. The 303's motor truck (R) has been carefully prepared, and is now on its way to Connecticut. Norm Krentel, Jeff Brady, Frank Hicks, and I will be flying to Hartford tomorrow morning (Friday), and we'll start work Friday afternoon. The job should be finished the next day, and we'll fly back Sunday afternoon.
Posted by
Randall Hicks
at
8:47 AM
0
comments
Labels: 36 Progress
Wednesday, June 16, 2010
North Shore 749 Celebration This Saturday!
On June 19, 2010, the Illinois Railway Museum in Union (McHenry County), Illinois will celebrate the return to service of Chicago, North Shore & Milwaukee Railway Car No. 749, following completion of a 23 year restoration. Eighty-two years young and looking as good as the day it was new, Car No. 749 beckons to riders who want a taste of classic electric rail transportation—and beginning June 19, you can take a ride on it into the past. This historic interurban car served the Chicago to Milwaukee route—downtown to downtown—for more than 30 years. The car will be open for public viewing at noon; a ceremony and ribbon cutting will follow at 1 pm. After the ceremony, the car will make its first trips for invited guests boarding from the restored CTA 50th Avenue Station. It will continue in service for the afternoon. Additional Chicago, North Shore & Milwaukee Railway equipment will be on display, including the historic 1941 Electroliner, which will be open for tours.
Built in 1928 at the Pullman Company's south side Chicago factory, Car No. 749 was acquired by the Illinois Railway Museum from scrappers after the abandonment of Chicago, North Shore & Milwaukee Railway service in 1963. The 749 restoration is the first complete restoration of an interurban car attempted by the museum. Executive Director Nick Kallas describes the restoration as an excellent example of the quality and thoroughness of this all-volunteer museum, stating “While there was a core group of volunteers led by the late Roger Hewett who worked constantly on the car, we have identified almost 30 volunteers who at one time or another applied a special skill or just an extra pair of hands to a large project. Whether it was locating a mill in England that could still replicate the upholstery fabric, or fabricating a mold for an obsolete part, our volunteers applied their talents to overcome every obstacle.” Among those 30 volunteers are several youthful workers who were not even born when the railway line quit operation in 1963. Volunteer Scott Greig pointed out that new and unfamiliar skills were learned for the project—everything from metalworking to carpentry and wiring.
Executive Director Kallas also commented that without the financial support of friends and members of the museum, this restoration could not have taken place. The project volunteers also drew on their own financial resources to see the project through.
Museum Librarian Barbara Lanphier, who grew up riding the North Shore Line on an almost daily basis, reminds us that each year finds that fewer and fewer former riders and employees remain. The museum has contacted surviving employees of the long-defunct railroad, and has confirmed that they will be on board to relive a long-past part of their lives.
The Illinois Railway Museum is the nation’s premier museum dedicated to transportation history, featuring steam, diesel and electric rail transportation, motor buses, plus trolley buses from the United States and Canada. For more information on museum operations, visit the museum’s website at www.irm.org or call 1-800-BIG-RAIL (800-244-7245)—recorded information only.
Photo by Gwyn Stupar
Posted by
Frank Hicks
at
7:37 AM
1 comments
Labels: North Shore
Tuesday, June 15, 2010
Preparation Takes Many Forms
On the roof of the 319, I bolted down the second trolley base and made the connections to the cables, so it's ready to install poles when we get a chance. I did some cleaning inside the car. I talked to Nick about lettering and gave him the stencils we have used for the blue cars. More about that later, too. Finally, I sanded down another window and painted two of them.

Over at Barn 2, work is nearly complete on preparing the 409 for painting. It looks to me like they're doing a very thorough and careful job.
At some point while it was in Cleveland, all of the brass lift tabs for the 319's windows disappeared. I've taken a sample to a foundry to have new ones made, but they don't seem to take us too seriously. In the meantime, if the car is going to operate, we need some way to raise the windows. So I bought a few bags of these little wooden knobs at a hobby store for $3. They're not meant to look like anything, but they will be useful until the correct fittings can be installed.
And if you're interested, here are the trucks we got from East Troy. These are the two I mentioned last time, with wooden bolsters. They have GE 74 motors. The bolster on the left has pretty much rotted away, but it could be replaced easily.I forgot to mention that in order to load these trucks, our guys had to bring their own locomotive, since there's no trolley wire where the trucks were stored. So the Joy 2 was loaded onto a flatbed and taken up to East Troy. It's now safely back at IRM. And many thanks to Norm Carlson and our friends at East Troy for the trucks and electrical equipment!

And here's a truck that was under the L5. The L5 is of interest because the TM created a steeplecab on top of a Hicks-built flat car. Unfortunately, it was scrapped many years ago. These trucks are also a TM design. This one lost its motors, and also its brasses. So it now has wooden bearings. Wood -- what can't it do?
Posted by
Randall Hicks
at
8:15 PM
7
comments
Labels: 319 Progress
Monday, June 14, 2010
Unloading the Rio Open Car
Posted by
Randall Hicks
at
8:41 AM
1 comments
Sunday, June 13, 2010
319 Runs
Today Frank and I got the 319 running under its own power for the first time since it arrived at IRM. The blue cars were scheduled to operate today but didn't, due to the intermittent rain.
First, though, we went out to the 321 to get the stencils we'll need for the letterboard, a cover plate for the control system, and to work on fastening the tarp more securely.
We also replaced a defective retriever on one end of the 319, and then started working on the roof. I had to redrill the holes for the two trolley bases; one of them is now bolted in place, and the other I can do myself. We're much closer to having the car able to operate by itself.
And as a publicity note, the IRM segment on "Cruisin' Illinois" should be aired this Thursday evening on the 9PM news on Channel 9. You can probably get WGN just about anywhere on cable, so watch for it!
Frank adds...
Video of the 319's first run is here. And in addition to all of the events mentioned above, there was also progress on the electric car shop extension. The wall between the "old new" shop (the previous extension) and the new extension was knocked down, presenting the view shown below. While the new extension has HVAC it doesn't have lights - we still need to raise several thousand dollars for those. Donations to the Car Department shop fund are greatly appreciated!
Posted by
Randall Hicks
at
8:20 PM
6
comments
Labels: 319 Progress







