The first thing to do today was to check up on the 308 and 309; everything looked fine. They operated both days over the weekend. On Saturday, I was the motorman with Greg Ceurvorst as conductor; after two trips it started to rain so the train had to be put away. Yesterday the cars operated for the Transport Extravaganza as seen here, with Jim Nauer and Dave Hammer.



Three of the slats were missing parts, so they had to be removed, as seen here. I was able to re-use all of the machine screws that hold them in, however.

I scraped off all of the loose paint and rust and put brown primer on everything. This, of course, is the underside of the assembly. Next time I'll turn it over and paint the top side.
And here's a detail from an in-service photograph which shows what the trap will look like when it's installed. The next thing to install will be the ventilators along both sides of the roof.


Soon the Camp Grant will be just another bad memory, like the mobile classrooms.
1 comment:
How can you build a better lobster trap when you spend so much time telling fish tales?