Another update from Gregg Wolfersheim on the UP doodlebug:
Some more news on M-35's progress. I'm having Fox Valley Glass re-glaze the bathroom windows in the car. These two are from the WOMEN's room. They are in rough shape.
One of the windows is back from Fox Valley with frosted glass. I was able to get it back in place. The whole room has been painted, and some of the accessories have been installed. Note the mirror and soap dish. The board in front of the window helps hold up the wash basin, which hasn't been restored yet.
Same wall, but showing the lower area with the waste can mounted. The unpainted area to the left will be covered by the water cooler when that is put back in. It faces the aisle, but takes up the corner in the bathroom.
Turning 180 degrees, we see the front wall. It only has a lonely coat hook applied. The window that goes in to the left is also getting frosted glass installed this week.
No comments:
Post a Comment