The Wednesday guys keep working, of course. Henry and Jonathan have put a first coat of primer on the 36's train door. It looks good, and we should be able to install it in a few weeks. This is the outside surface, and the inside is painted also. Thanks again!
Today was cold and damp and drizzling most of the day, so painting was not an option. I spent most of my time working on the 36's electrical system. The first grid box has several bad elements and needs a complete overhaul. So I needed to drop it from the car.

For future reference, here are the connections before they were disconnected.

In any case, I'll want to take the grid box to the shop. I'm hoping the shop guys can schedule it at some point. We have several grid box experts who know just what to do.

And I installed the next contactor in the series, the one on the right. It's been about a year since I worked on this, but it all comes back in a hurry. This box is under the car and opens inwards, so working conditions are very cramped. But I'll try to keep the whining to a minimum. 

The next problem that cropped up is that evidently this classy old C6 controller with the original style handle needs some adjustment. I could hear it hissing while trying to test the new contactor, and after removing the cover, could see the arcing taking place. So that needs to be worked on also.
In any case, we're making progress. Of course, we can always use more help!
2 comments:
The sistered 2x4's will keep things up in the air for now, but my vote is to replace the original beams before the car is considered for running. That may be sooner than I am aware of. Probably white oak beams which we can make in the wood shop, although that would mean a bigger job to drop all the boxes to replace the beams. The bright side is that you might discover other issues needing attention before they move to failure mode.
Always here to help.
Bob Kutella
Bob: You may well be right. As I think about it, though, maybe the boxes wouldn't have to be disconnected. If they could just be let down a few inches onto a platform, the beams could be replaced and then the boxes bolted back onto the new beams without breaking all the connections. We can talk it over sometime. Thanks!
Post a Comment