On Monday I was working on seats in the 309, as usual. The one at this sector just was not reversing properly, so I pulled it back out and set it aside.
I had one in storage that worked properly, perhaps the only one in storage that did, but it was missing the foot rest mechanism, another Rube Goldberg device. So I had to remove it from the previous frame and reassemble it. This is only fun for so long.
Meanwhile, of course, the other weekday regulars were doing their thing. Here we see Pete polishing up the beautiful brass light fixtures for the ceiling of the 28.
And here John and Phil are working on rebuilding a 306 door.
By afternoon I managed to reassemble a working seat frame and install the back. The hard part here is inserting the screws that hold the back into the frame when it's right up against the wall. So the frame is not attached yet, but the seat seems to move back and forth properly.
And then Steve Keller was fabricating new parts for the hand brake chain mechanism at the #1 end of the 306. It was missing for some reason, but the parts at the other end provide the pattern that needed to be duplicated. Here he's holding the new pulley, and the frame is on the workbench.
And here we see brand new parts for the Kansas City PCC which Steve Iversen had a place in Tulsa produce for him. They now need to be welded in place.
And that's just a sample of what was going on.







No comments:
Post a Comment