Wednesday, March 18, 2015

Spring Break

This week happens to be Spring Break for me, so this is a report for two days of work.


On Tuesday, it was time to install some more saddles.  Five at the east end of the car were finished before the caulk ran out.





Then I put another coat of canvas paint on the lower roof, south side.  Now that we have nice newly-painted L cars on 82, I don't want to work in the center aisle.  I never liked that rolling platform on the uneven surface anyway.  When the time comes, I will switch the 319 over to 84, where the 309 is, to do the other side.






Tim went into the 1754 to look for parts, so I got a chance to take a couple of pictures of the interior.   Its general condition is much like the 321 -- not good.





And then some more work on the vestibule of the 36, finished with a first coat of blue on the pocket door.


And a nice sunset.









On Wednesday I started by attaching one of the rope guards.  The strings hold it in position while the screws are inserted.




Then all remaining saddles were attached.  The next step will be to attach the running boards, which should arrive next week.


And I installed one of the grab irons.  These are a matter of life and death, so it's important that they be done right.  I stood on it, I hung from it as best I could, and was able to rock the car from side to side a little by yanking on it, all without any perceptible motion.  So that's encouraging.
Then there was more stripping and sanding in the vestibule.  That is annoyingly slow and tiring.  Then I thought of something slightly more fun to do.  While repainting the smoker over the winter, the ventilators had to be closed while the compartment was heated.  But for passenger service we will undoubtedly keep the ventilators open, as we do on the other cars.  So I pried the doors open, sanded the sides of the chutes, and put on white primer.  Next time they'll get a finish coat to match the rest of the ceiling.  This is the only CA&E car with this type of ventilator.

Monday, March 16, 2015

Birth Announcement

 
Off-topic, perhaps, but we have something new on the blog: a new baby!

David and Katy Wilkins are now the proud parents of a baby girl, Alexandria Rose Wilkins, born on Friday in Salt Lake City.  Mother and child are doing well.  The father, however, is acting strangely and needs to be kept under clinical observation.  Dr. Hicks suggests liquid sedation.

Back at it

Frank writes...

Sunday was my first day back at the museum since October, what with my busy wintertime work schedule, and I picked a good day to go out: highs were in the 60s and it was partly sunny so it was a great day to be outdoors.  I didn't get a whole lot done but I did help out with a few switch moves.  These revolved around the CTA 2000s, which were just repainted (see below) and look better than new.  They're also our new neighbors in Barn 8, parked right next to the 319, so we'd better be careful with that black roof paint!

I spent some time wandering around and acquainting myself with some of the progress since I was last out.  Richard, Greg and another volunteer whose name I'm afraid I managed to forget were putting poles and roof cables back on the 2000s while Norm and Jeff were back in the barn working on the Michigan interurban car.  With roof work on the latter essentially done they are now tackling the badly deteriorated floor at the front of the car (the rear platform floor was rebuilt in the early 2000s).
I also went over to Barn 7 and spent a bit of time looking over the CSL "green cars," the 2843 (shown above in service) and 2846, because I'm working on historical articles about these cars which should appear at some point on this very blog.  And you can help!  I'm looking for photos of these cars (in-service photos or pictures prior to their stint in Barn 7) or any original CSL documents pertaining to them.  Any assistance will be very helpful in fleshing out the history of these "hidden in plain sight" gems.

Thursday, March 12, 2015

Operating Schedule for 2015

The operating schedule for the CA&E wood cars for 2015 has been finalized.  As usual, the consist will typically consist of two cars.  While we will most likely start the season with the 308 and 309, we are hoping that the 319 will be back in the regular operating fleet early this summer and it will likely be swapped in for one of the other two cars.  The 36 will remain a "special event" car for the time being, particularly as it is still seeing interior repainting work.  And, of course, operations are always subject to weather and mechanical considerations.  But here's the plan.

May 25th (Memorial Day)
June 6th
June 7th
June 20th (Chicago Day)
June 21st (Fathers Day)
July 3rd
July 4th (Trolley Pageant only)
August 2nd (Vintage Transport Extravaganza)
September 5th
September 6th
September 7th
September 17th-20th (ATRRM Convention)

We should have three or, hopefully, all four cars running for the July 4th pageant.  Then on the Sunday of Labor Day Weekend, September 6th, the wood cars will be taking the 3pm-9pm shift for IRM's inaugural "twilight ride" event.  It will be the first time for these cars carrying revenue passengers at night at IRM, I suppose, and it should be fun.  And then later in September the cars will be operated as needed during the four days of the ATRRM Convention.

So mark those calendars now, and don't forget to sign up to be a motorman or conductor.  Help in crewing the cars is always appreciated!

Wednesday, March 11, 2015

CTC Panel from Rondout

Bob Olson of the Signal Department reports:

IRM received the generous donation of the CTC panel from the METRA tower at Rondout, IL on Monday, March 9, 2015. The panel, which was installed in 1963, controlled the crossing of the EJ&E and the junction to the line to Fox Lake and Madison.  One of the last manned towers in the Chicago area, the tower was cut over to remote control by the CP dispatcher in Minneapolis last Friday night.
 

This picture shows the panel loaded on the IRM pickup truck. Pictured left to right are the  district signal tech, the local signal maintainer, and Metra Trainmaster Robert Conway.

Tuesday, March 10, 2015

319 Roof Report

Another nice spring day meant more progress on the roof.  I drove into Woodstock looking for the lumber we'll need for the running boards, but it wasn't in stock.  It should arrive next week.

Meanwhile, I started installing the saddles.  You know, it's nice to get (nearly) instant gratification.  On Saturday I left a note for Rod ordering screws for this project, since slotted wood screws are lamentably hard to find.  They arrived today and went right to work.


In order for the saddles to line up with the carlines, the position of each carline can be marked with chalk on the edge of the upper roof, based on the clerestory moldings.


Then the jig is used to make a straight line across the roof, and the center is marked, followed by the outline of the saddle for applying caulk.  Some of them had to be repositioned slightly to avoid drilling into the steel carline stiffeners.  That doesn't seem to work very well.




 And seven saddles were installed today; my back started to complain.  There are 16 altogether, so if my calculations are correct, we're almost halfway done. 








In other news, the ATRRM magazine has now been put online at this link, and is essentially a blog.  It looks nice and as material is added, it should be an important resource for learning what else is going on at other museums around the country.

Saturday, March 7, 2015

In the Spring

Well, that was quick!  Winter suddenly turned into spring, as often happens around here.  The sun was shining, the snow started to melt, and so:

In the spring a young man's fancy lightly turns to thoughts of....

Actually, I don't quite remember.  You'd have to ask Mr. Tennyson.  My thoughts, on the other hand, quickly turned to finishing the roof of the 319.  I want it to be one of the primary service cars this year, again. 
The first step is to put on a final coat of black canvas paint.  With the sun out, it was nice and warm up on the roof.  I threw off my sweater and worked in a short-sleeved shirt.  This canvas will be as water-tight as anything can be.  I didn't get to the sides or ends, but those can be done later.  The main thing is to finish the center, so the saddles and running boards can be installed, starting next time.


After that was done, I made myself a guide for marking the location of the saddles, since there's no guarantee that the seam in the canvas is centered.  The saddles need to be centered over the carlines, and that's not easy to do.





Let's see what's happening with the 24.  Tim was repairing many of the seat frames, filling the gaps with epoxy.


Two of the fancy new marker lights have been temporarily installed on the end of the car, and are quite impressive.  Several things need to be done for the final installation.




But while we're here, we have an interesting view of the motorman's cab.  This is the smaller of the two cabs.  

And as usual, lots of other things were going on that I didn't have time to record.

Tuesday, March 3, 2015

Blocked By Ice

I didn't go out to the Museum today due to the bad driving weather: snow, sleet, freezing rain, etc.  The TV news was full of tales of woe, including stalled CTA trains, obviously due to sleet on the third rail.  The reporters, though, weren't quite sure what the problem was, and claimed that the "tracks were blocked by ice."  Hey, we've got the solution right here...

Sunday, March 1, 2015

Material Donations

IRM has just received a sizeable collection of railroad artifacts from an anonymous donor.  Some of the items can be used immediately, others will be valuable spare parts, some can eventually be put on display, but it's all of value and greatly appreciated.  Here are just a couple of things that were held out before putting the rest into storage, since they're from the CA&E.


 A first aid box in excellent condition, with all contents in place.  I'm afraid the modern first aid kits we use on the revenue cars don't include "dental poultice", whatever that is.


And another nice, soothing scenery picture that would be mounted on the bulkhead of a car.

And then there was also a huge collection of books.  We can't thank this person enough!  Now if you have a collection, large or small, of railroad-related items and are wondering what to do with them, wonder no longer.   IRM will be glad to give them a good home.  Say, did I mention that any donation is tax-deductible?  You can call the office during business hours, and they'll take it from there.  Thanks!

Saturday, February 28, 2015

Give Me a Buzz

Although spring has not yet sprung, we have only so many days during the winter to do restoration work before inspection season starts, and visitors start wandering through the barns, and one's controller hand starts itching, and so on.  So we need to just keep on stripping and painting.


I'm making slow but steady progress in the #1 vestibule of the 36.  This part of the front wall was sanded down and painted with primer.  The brake handle will have to be removed for stripping, but so far the set screw has resisted all attempts to loosen it.   Resistance, however, is futile. 




And the vestibule door was stripped, sanded down, and painted with first primer.  There's just no way to get far enough away from the door to take a good picture of it. 




 
On my one visit to the car shop, it was apparent that work continues as usual on the 24.  Tim has finished several of the seat backs and cushions for the Bowling Alley, and here they have been covered with paper for protection, and are stored on this rack.

The next one is in below-average condition, so it will need more structural repairs than the others.  




It looks like Keith is proud of the work he has been doing on the chandeliers.   There are three of them in the car: two have three bulbs, and one has four.  That adds up to ten, which is a multiple of five.   So the math works out.  The two clear bulbs are the type to be used; these are special bulbs with carbon filaments and high vacuum, so they're approved for railway car use.



 
And on the subject of equipment, here's the buzzer interrupter box on the 36.   The bare spots on the ceiling above it shown by the yellow arrows are the unmistakeable (to me) footprint of the earlier type of interrupter, as used on the 308 and 309 (below).  It's not clear whether the interrupter was replaced at Wheaton or at Cleveland, but it was obviously after the car was painted red, so it would be nice to go back to the earlier style. 

The long cylinder houses a basically inaccessible 5K resistor needed to drop the voltage to the buzzers.  I'm not aware that we have any of these in storage at IRM, so I'd like to find one that could be made operational if there are any in private collections.  Therefore, if you happen to know of one that we could acquire by donation, purchase, and/or trade, please give me a buzz.   Thanks!

Tuesday, February 24, 2015

36 Report


 The last two third rail beams for the 36 are nearly complete.  Today the fuses were installed, as seen here.   Unfortunately the fuses may lead to an electrical dead end for the foreseeable future, but we can always pretend they're connected in back somehow, right?



 Tim helped me get them off the bench, since that's valuable real estate, and they're now sitting on the floor near Bill's workspace for CRT third rail beams.  Once the weather warms up, which may happen some time later this calendar year if we're lucky, they can be mounted on the car.




After that, it was time for more work on the vestibule.   The flag box was put back in place and painted blue.  Then the rest of this side of the vestibule, down to the floor.






 And more primer on parts of the front window frame, etc.  There is no real way to speed up this process very much.



Meanwhile Tim continues to work on the bowling alley seats.  Here he has rigged up a system of clamps to compress the springs on this 15' long seat frame so the new rattan can be attached under tension.

Monday, February 23, 2015

How They Did It In Boston

 
Bill loaned me an old book about Boston Rapid Transit with this interesting picture of third rail shoes on a steeplecab.  The picture on the left zooms in on the truck.

There are two wire brushes that can be pushed down by springs, but the springs don't look very strong.  I fail to see how this could be very effective.  In the picture, the brushes are both held off the rail by the wooden handles above them, which are in the vertical position.  And the shoe itself is just a flat bar bent into a U shape.  It can't be very heavy, but there's also a spring above it.  I guess it must have worked.   It appears to me that most rapid transit cars had the same type of third rail pickup, but without the wire brushes.