Gregg continues his work on the UP M-35. I was out of town so these pictures were somewhat delayed in getting onto the blog. Better late than never...
The outer wall got painted recently in the women's room.
|
The aisle side was stripped of paint and old varnish.
|
Then a coat of primer was applied.
|
Another baggage rack was stripped and painted pictured here in the steam shop. It's now ready for installation |
|
The outer wall on the aisle side getting a coat of tan on the top half. Later, the lower part will get the brown. |
|
The wooden toilet seat is being refurbished outside while the weather is cooperating. |
|
The door for the water cooler by the Men's room is getting painted too. The lower tips are brown with the rest in tan. |
I should point out again that Gregg doesn't have to do anything special to get his project featured on our blog. He just sends us a few pictures with clear, concise captions every so often. And we're glad to publicize anything constructive that's going on at IRM.
No comments:
Post a Comment