The last two days were spent painting the interior, as usual, and a lot got done. As long as it's not too bitterly cold out, the space heaters can bring the temperature inside the smoker up to a level suitable for painting.
First finish color on two of the corner seats.
And primer on all of the side wainscoting.
One of the arm rests was completely stripped before getting first primer. If I had to get all of the paint out of the grain, this would take ten times as long.
Then there are the window shade tracks.
And on Thursday, all of the wainscoting got first finish color, among other things.
News Flash!!! The seconds are ticking away on the contest clock, if you want to make a tax-deductible contribution to IRM in 2014. (And why wouldn't you?)
No comments:
Post a Comment