Doodlebug Progress

 Gregg Wolfersheim continues on his restoration of the UP M-35 doodlebug:



With the inner walls now painted, I was able to fit some insulation below window 13. Number 14 needs a piece of trim first, which is now in the pre paint  position.


Window number 16 is in primer after fixing a corner. Various pieces of trim are pictured in primer. Soon a top coat of paint will be applied.


Some of the window quarter round pieces have just been painted. In the forefront is window number 17. It is in kit form. The side and top pieces are salvageable. However, the bottom piece (right side), is rotten. A stick of mahogany was procured and a replacement will be made next week.